Tynan Winters' Project Portfolio
1.) Supercapacitor Integration and Battery Management System (BMS) - Senior Project 2018 – 2019 Project Scope and Objectives: Research, design and build a full-scale current collecting powertrain utilizing supercapacitors as the primary energy device for propelling the bogie when wayside power is not available. 1. Accelerate a 400lb bogie to 2mph with only wayside power 2. Propel a 250kg bogie at 2mph using only supercapacitors to the next wayside pickup. 3. Passively connect the wayside power rails with each current collector mechanism using a sloped rail. 4. Recharge on-board energy storage within the amount of time it would take for a passenger to exit and a new passenger to enter (~two minutes). 5. Safely control supercapacitor charging, discharging, state of charge and balancing using an off-the-shelf battery management system. Project Re...